3D Face is a integrated project for developing an advanced biometric recognition system in a coherent way. The integration is evidenced at three levels: management, research stage and functionality.
The management of the project will be strongly integrated in order to avoid independent activities for the independent work packages.
The overall structure of the project is shown in the figure below:
The functional links between the work packages shown in the next table demonstrate that 3D face is an Integrated R&D project. The table concentrates on the first 18 months and also give some links between the next months as an example. Each work package will provide some outputs for other work packages to benefit from its inputs. The information exchanged will have to be characterised and formatted through the collaboration of the work package leaders.
WP N° | Delivers the result, report, proto or database | At Month X | To WP N° |
---|---|---|---|
WP1.2 | Delivery of dissemination plan for the project | M03 | WP1.1 |
WP2.1 | Report from task 2.1.2, a set of attacks using fake faces | M02 | WP2.2 WP2.4 WP3.1 WP3.5 |
WP2.1 | Report from task 2.1.3, a detailed specification for an operational architecture, Interfaces between components are described to achieve interoperability within the final operational system | M04 | WP2.2 WP2.3 WP2.4 WP2.5 WP3.2 |
WP2.2 | Dissemination of first example data and data format specification. | M03 | WP2.3 WP2.4 |
WP2.2 | Two mock-up acquisition devices are delivered in turn to IGD, UKE, and SGM in order to collect test data. | M06 | WP3.1 |
WP2.2 | Prototype acquisition devices are delivered to the other research partners. | M15 | WP3.2 |
WP2.3 | Initial algorithms for template generation | M09 | WP2.5 |
WP2.3 | 3D recognition algorithm | M09-M12 | WP2.4 |
WP2.3 | Standardized reference frame | M12 | WP4.1 |
WP2.3 | Prototype system | M15 | |
WP2.3 | Feature extraction algorithms and feature extraction | M15 | WP4.1 |
WP2.3 | 3D recognition algorithm and scores | M18 | WP2.4 |
WP2.4 | Report on Implementation Strategies and Overall Framework | M06 | WP2.5 WP3.1 |
WP2.4 | Software prototype for testing and evaluation | M18 | WP3.1 |
WP2.5 | Software prototype for testing and evaluation | M18 | WP3.1 |
WP3.1 | Delivery of initial database “Database 1” | M09 | WP2.2 WP2.3 WP2.4 WP2.5 |
WP3.1 | Report with first results from tests to improve performance of acquisition devices, 3D recognition algorithms and multi-modal research | M24 | WP2.2 WP2.3 WP2.4 |
WP3.1 | Report with results from tests to provide information for the selection of sensors, software components and settings | M24 | WP3.2 |
WP3.1 | Report of testing procedures and liveness security testing | M06 | WP4.1 |
WP3.2 | Prototype from task 3.2.3, the prototype to install on the airports | M29 | WP3.3 |
WP4.2 | A general decisional guidance on the “global” vision of cross-jurisdictional, societal and ethical issues | M04 | WP2.1 WP2.2 WP2.3 WP2.4 WP2.5 WP3.2 WP3.4 WP3.5 |